top of page

PROJECTS

VICTORIA

A recently installed climate control system compromising of 2x VRV systems. Installed in just 4 weeks and integrated onto the building management system to aid with minimalising energy usage.

HVAC Services in Victoria

LEE VALLEY VELOPARK

A full mechanical installation of Air Conditioning, Ventilation & Plumbing to utilise redundant space post Olympic games.

Public Sector HVAC Services

FIGHT FOR PEACE

Cooling, Heating & Ventilation installed into this community boxing & sports venue recently

HVAC Services in Gyms

VERDE BUILDING

In-depth investigational & repair works carried out within the Verde Building to an exisitng system to improve comfort for office staff and employees. All works carried out out of hours to minimalise client disruption

London Air Conditioning Services

STAINES POLICE STATION

Extensive works carried out to the Air Conditioning, Heating & Ventilation Systems to create a comfortable communal areas for staff

Public Sector HVAC Services

MUSIC THEATRE INTERNATIONAL

During a complete refurbishment, we replaced all Air Conditioning, Ventilation & Plumbing equipment within the building. Splitting the building in two and completing separately so the client could remain working whilst works were carried out

2021-02-24 11_07_25-10 Mortimer St - Goo

VICTORIA STREET

Extensive works carried out on Chillers, Boilers, Air Source Heat Pumps, Chilled Beams, Ventilation & Plumbing Systems in several buildings in this prestigious area.

Victoria.jpg

RAK STUDIOS

Extensive works carried out in this famous recording facility located in London. All works have been sympathetic towards acoustic requirements and the Studios history with minimal disruption achieved

RAK.jpg

MARKETTIERS 4DC

A full Air Source Heat Pump & Ventilation System designed and installed to ensure consistent employee comfort

Markiteers.jpg

THREADNEEDLE STREET

A full design and build carried out in this building. Redundant chillers replaced with Air Source Heat Pumps, AHUs & VAMS. All ventilation controlled via CO2 levels to maximise efficiency and keep IAQ at an optimum level

thredneedle.jpg

SOANE POINT

This building was part-refurbished recently and upgraded from split systems to VRV

reading-office-centre.webp
bottom of page